The JJM Company, acting on behalf
of the above Investor, as:
- DEPUTY INVESTOR/ FIDIC ENGINEER, (from the commencement
to the completion of the construction works), and
- PROJECT MANAGER (during the final stage of construction
works),
has completed in 2001 the construction of the "BLUE
POINT" OFFICE & BANKING COMPLEX at 61 Stanów Zjednoczonych
Str. in Warsaw.
On January 7, 2002 an occupancy permit decision was issued
with respect to the Complex and the Owner was abble to commence
regular business activities there.
Mr. Wojciech Jankowski was the General Desig Architect of
the project, working together with a team of designers from
the leading construction design firm - JKM Co. Ltd. as well
as with other Polish specialized firms.
The project was carried out by Polish construction and assembly
firms, and partially by foreign contractor firms operating
in Poland.
A modern representative building with the cubature of 102,284.00
m3 and the total area of 26,175.00 m2 consists of two parts:
a 17-storey tower and an 8-storey lower part.
The air-conditioned offices with top class fittings are equipped
with the most modern telecommunication devices, which meet
the latest international standards. The functional design
of offices follows the "open space" rule, thus enabling
arrangement of space in conformity with customer's requirements.
A cafereria for employees and guests is located on the first
floor of the tower-part of the complex. Terraces with green
areas add a nice finishing touch to the overall impression.
The underground part of the building contains parking lots
with two-level movable parking platforms with 219 parking
spaces. 66 parking spaces are located on the ground level.
In the higher section of the building there are five passenger
lifts, including one emergency lift able to operate in the
extreme conditions of fire. In the lower part there are two
passenger lifts.
Basic systems in the building (heating, electrical system
and air-conditioning) are controlled via integrated BMS system.
Modern fire-protection system, access control system and closed-circuit
TV system ensure security of the employees of companies whose
offices are located in the building complex.
The skeleton structure of the building has been made of reinforced
concrete with the application of column-and-ceilings technology
with a renforcing communication core. The façade was
made predominantly with the application of solid, reflexive,
thermofloating/thermoexpandable glass in the "arctic
blue" color and partially with natural and artificial
stone.
The JJM Company is very pleased with having been entrusted
with the duties of deputy investor and project manager of
such a demanding and complex investment project.
|